Weekly Release information.

Updated:

Reservoir level:

Release: (see table below)

28th August 2026

181.59mAOD

A release

The EA have requested low flows in order to carry out essential river works in the North Tyne; this work is proposed to take place week commencing 14 September 2026 and will take up to 2 days. This is currently provisional based on river levels being elevated, if river levels remain low then the project team will utilise the programmed release and will not require a change in flows from the schedule’

Trigger Levels and actual Friday level

kielder 28.8.26.png

Historical Level 2025

Historical Level 2024

KD 2025.jpg

Historical Level 2024

KD 2024.jpg

Historical Level: 2023

kielder.PNG

Historical Level; 2022

DEc 30.JPG

Historical Level; 2021

KD Historical Level 2021.jpg

Historical Level; 2020

KD2020.jpg

Historical Level; 2019

KD 2019.PNG

Historical Level; 2018

KD 2018 Lake Level.png

Historical Level; 2017

KD 2017 Lake Level.png

2026 Planned Release Document and Introduction

The links below include the Introduction PDF and the 2026 Planned Release Dates and Times

2026 Proposed adjustments to the Kielder release schedule

The attached document gives advanced notice of release changes outside of the normal release schedule during 2026